Entity
Description
The Final Design included the Civil Construction Works of three aerated lagoon WWTPs which will benefit the following populations:
-
WWTP 2 – Guemmar, Debila, Taghzout and Hassani Abdel-Krim, with a total population of 79 620 and flow of 14 332 m3/day;
-
WWTP 3 – Magrane, Hassi Khelifa and Sidi Aoun, with a total population of 72 286 and flow of 13 011 m3/day;
-
WWTP 4 – Reguiba, with a total population of 28 451 and flow of 5 121 m3/day.