Entity
Description
The Infulene WWTP is designed for 90 000 eq-hab (2000 m3/h). The assignment was developed in the scope of the Sanitation and Drainage Master Plan for the Greater Maputo Metropolitan Area, including the following activities:
- Detailed description of the preliminary works and of the inlet facility rehabilitation works, as well as the necessary operating procedures for the works execution.
- Improvement/creation of accesses.
- Design of the sludge drying beds and stacking platforms.