Entity
Description
The conveyance system aimed at the water supply to a population of about 2,500,000 inhabitants and included:
-
Conveyance pipeline between the Sidi Lahdjel water treatment plant and the Oran reservoir, involving approximately 88.5 km of pipelines with diameters between 1,800 mm and 2,200 mm;
-
Pumping station, with 4 +1 groups with a total capacity of 3.6 MW and flow of 4. 0 m3;
-
The buried reservoir of Mostaganem;
-
The Oran buried Reservoirs (2).