Moura-Safara Subsystem
Moura-Safara Subsystem
Entity
Description
Final Design of the Moura-Safara subsystem infrastructures, which will supply water to Moura and Barrancos municipalities, becoming part of the "High Level" public supply system of Águas Públicas do Alentejo.
This project included:
- The construction of a Reservoir (2 x 1000 m3);
- 23.5 km of gravity pipes in FFD and Steel, DN 300;
- 4 km of Feeder Pipes in FFD, DN 400 and
- Rehabilitation of two reservoirs (1 x 1 x 150 m3 and 750 m3) and construction of the delivery points
Objectives
- Improve water supply system
Results
Final Design