Aljezur Water Supply and Distribution System
Aljezur Water Supply and Distribution System
Aljezur Water Supply and Distribution System
Entity
Description
Renovation and construction of new connections in the municipality of Aljezur comprising the installation of:
- 14,300 meters of linear pipe under pressure in FFD DN300
- 16,000 linear meters of piping gravity in FFD DN300
- 5000 linear meters of pipe gravity in FFD DN200
The construction of a water tank with a capacity of 2000 m3 and the extension of existing building lift station so as to contain more than three groups pump (3 * 132Kw) completed the supply.
Objectives
- Improvement of the Water Supply System
Results
- Works' Coordination and Supervision
- Costs and Planning Control
- Quality Control
- Safety Coordination