Rehabilitation of the irrigation perimeter of Humpata and Neves Dam
Entity
Description
The Preliminary Design covered 2 stages: diagnosis of the situation and the basic and alternative Solutions.
The intervention aims to the operationalization of an irrigated perimeter to about 1300 ha.
It was defined a scenario of solutions to significantly increase the irrigated area.
In the study were considered a set of complementary and / or alternative works, subject of technical-economic appreciation.