PT EN

Angola Energy 2025 Project. Preliminary Designs of 20 Hydropower Schemes

Thematic Area
Sustainable Development and International Cooperation
Water and Cities
Water, energy and Food
Innovation
Location
Angola
Application Areas
Water Resources
Scope
Local or Regional Administration
Angola Energy 2025 Project. Preliminary Designs of 20 Hydropower Schemes
Angola Energy 2025 Project. Preliminary Designs of 20 Hydropower Schemes
Angola Energy 2025 Project. Preliminary Designs of 20 Hydropower Schemes
Angola Energy 2025 Project. Preliminary Designs of 20 Hydropower Schemes

Entity

Description

Design, preliminary design and budgeting of 20 Exploitations high hydroelectric schemes:

Mucundi: 73, 5 MW,

Salamba: 47,9 MW,

Quissuca: 120,7 MW,

Cuteca: 203 MW

Carianga: 381,3 MW

Bembeze: 259,6 MW

Cacombo: 29,2 MW

Cuvera: 61,8 MW

Calindo: 57,6 MW

Calengue: 189,7 MW     

Capitongo: 41,1 MW

Quissonde: 120,5 MW

Zenzo I: 460 MW

Zenzo II: 114,3 MW

Túmulo do Caçador: 452,9 MW

Cafula: 402,9 MW

Utiundumbo: 168,9 MW

Dala: 360,3 MW

Capunda: 282,6 MW

Balalunga: 217,2 MW