PT EN

Preparation of the Maputo Wastewater Drainage System Detailed Design and Works Supervision

Thematic Area
Sustainable Development and International Cooperation
Water and Cities
Water, energy and Food
Location
Application Areas
Water Services
Water Resources
Scope
Local or Regional Administration

Entity

Description

The design phase will involve three components: (i) design of the Polana (EE1) and UEM (EE2) pumping stations and rising mains; (ii) design of the main trunk sewers (E-MP1); and (iii) design the upgrades and expansion of priority secondary and tertiary network and sewer connections. EE1 was designed for a 111.1 l/s capacity and EE2 for a smaller one, 50 l/s. The value of the total equivalent population served by the E-MP1 was estimated for the year 2040 (420,784 equivalent inhabitants).