PT EN

Ghana Saghlemi Housing - Urban Development Project

Thematic Area
Water and Cities
Water, energy and Food
Location
Accra, Ghana
Application Areas
Water Services
Scope
Business
First Phase of the 800ha greenfield urban development - 190ha
Buildings
first phase construction (190ha)
800ha greenfield urban development

Entity

Description

Development of the Master Plan and subsequent Detailed Design of an area of 190ha. This project included 1292 housing apartments distributed by 213 buildings with 3 different configurations. Also associated with the project was the design of 210 houses with 3 different configurations. Urban infrastructure design was also developed. The assignment included the preparation of Procurement Terms of Reference for the Geotechnical and Hydrogeological Prospection Studies.

Objectives

  • Development of the construction design for the buildings and town houses.
  • Infrastructures construction design for 190ha – first phase detailed design of the 800ha
  • Construction of a 800ha greenfield urban development, including Master Plan for the whole area.

Results

The design was completed and the first phase construction is in its final stages of completion.

Next challenges

Further develop our presence in the Ghanaian market.