Ferro Water Treatment Plant
Ferro Water Treatment Plant
Ferro Water Treatment Plant
Entity
Description
The contract included the following works:
- Building of Ferro WTP in Felgueiras - building that develops in 3 levels, integrating, in the first level, tanks (partially buried), pumps and other equipment, in the second level, filtration, sludge dehydration, chlorine storage and the location of chlorine dioxide chlorometers and, on the third level, the laboratory, toilets and control room
- Electrical installations
- Remodeling of Hydraulic Circuits.
Results
Management, Coordination and Works Supervision
Cost Planning and Control
Quality Control (Quality Mark LNEC)