Baixo Mondego Hydraulic Scheme
Baixo Mondego Hydraulic Scheme
Baixo Mondego Hydraulic Scheme
Entity
Description
The works were developed in two phases: In a first phase (1999-2001) the civil engineering works, with an extension of about 7 km, for the regularization of the Arunca River and, in a second phase (2001-2004), the works of repair and reconstruction of the infrastructure of the Baixo Mondego Hydraulic Scheme, in an extension of about 25 km.
Results
Management, Coordination and Works Supervision
Planning and Costs Control
Quality Control