Entity
Description
The system aims to supply potable water to 152.000 inhabitants by 2041 (project horizon year) and was designed for the maximum flow.
The Project includes the construction of water harvesting structure from Cahora Bassa Dam, a pumping station, force main, two raw water tanks, treated water tank, water treatment station, gravity main and water distribution network to Chitima.
Results
Preliminary Study
Final Design
Technical Assistance